If you are a college or university looking to setup a complete lab. Please contact us with your details for custom quotation. [email protected]

Replacement of Refrigeration Components

We are the leading manufacturer and supplier of Replacement of Refrigeration Components. Now accepting bulk orders for government tenders in every major country around the globe.

The Replacement Of A Faulty Compressor Or Other Components Of The Refrigeration System Are Amongst The Repeated Activities Of A Mechatronics Engineer For Refrigeration. It Allows For Training In These Processes. The Consequences Of Incorrect Procedures Can Be Demonstrated. The Components Are Integrated Into An Operational Refrigeration System. This Allows For The Practical Testing Of The Functionality Of Individual Components After Replacement. The Following Activities Must Be Carried Out E.G. After Replacing A Compressor:

  • Refrigerant Displacement (Pump-Down) Into The Condenser/Receiver (This Not Be Possible, Siphoning Off The Refrigerant)
  • Disconnection Of The Compressor At The Service Valves
  • Disconnection Of Electrical Connections
  • Compressor Replacement, Correcting Oil Level, If Necessary
  • Reconnecting Electrical Connections
  • Reconnecting The Compressor With The Service Valves
  • Evacuating The Compressor And Making The Connection To The System
  • Compressor Test Run, Checking For Leaks And Replenish Refrigerant, If Necessary
  • Checking The System Pressures

Learning Objectives And Experiments

  • Familiarisation With And Carry Out Basic Activities For The Servicing Of Refrigeration Systems
  • Replacement Of
  • Compressor
  • Pressure Switch
  • Filter/Drier
  • Solenoid Valve
  • Expansion Valve
  • Refrigerant Displacement (Pump-Down)
  • Mechanical And Electrical Assembly And Disassembly Of Components
  • Replenish Refrigerant And Compressor Oil
  • Leak Test
  • Compressor Test Run
  • Adjustment Of Expansion Valve And Pressure Switch

Specification

  • Trainer From The Practical Series For The Training Of Mechatronics Engineers For Refrigeration
  • Service Exercises In Refrigeration Systems
  • Complete Refrigeration Circuit With Open Compressor, Air-Cooled Condenser, Receiver And Air Cooling Evaporator
  • Replaceable Components: Compressor, Filter/Drier, Pressure Switch And Solenoid Valve
  • Required Accessories Evacuation Equipment And Tool Set
  • Overall Arrangement On Robust Workbench

Technical Specification

  • Open Refrigerant Compressor
  • Refrigeration Capacity: 450W At -5°C/40°C And 1450min-1
  • Maximum System Pressure: 18bar
  • Pressure Switch
  • LP: -0,2…7bar
  • HP: 10…32bar
  • Refrigerant
  • R513A
  • GWP: 631
  • Filling Volume: 1kg
  • CO2-Equivalent: 0,6t
  • 230V, 50Hz, 1 Phase
  • 230V, 60Hz, 1 Phase
  • 120V, 60Hz, 1 Phase

 

Tell us Your Requirements

Sending your message...



Your Cart

Your Cart is Empty! Go Shopping