If you are a college or university looking to setup a complete lab. Please contact us with your details for custom quotation. [email protected]

Biogas Plant

We are the leading manufacturer and supplier of Biogas Plant. Now accepting bulk orders for government tenders in every major country around the globe.

In a biogas plant, microorganisms biologically degradate the organic starting substances (substrate) under exclusion of light and oxygen. The product of this anaerobic degradation is a gas mixture which primarily consists of methane. This gas mixture is called biogas.

The experimental plant it serves to demonstrate the generation of biogas in a practical manner. The substrate is a suspension of shredded organic solids. It is hydrolysed and acidified in the first stirred tank reactor. Here, anaerobic microorganisms convert the long-chain organic substances into short-chain organic substances. The biogas forms in the second stirred tank reactor in the last step of the anaerobic degradation. It contains mainly methane and carbon dioxide. This two-stage method enables the ambient conditions to be adjusted and optimised in both reactors separately. The digestate is collected in a separate tank.

Learning Objectives/Experiments

  • Achieving a stable operating state
  • Influence of the following parameters on the biogas generation
  • Temperature
  • Substrate
  • Volumetric loading
  • pH value
  • Influence of the operation mode on the biogas yield
  • Single stage or dual stage
  • With and without post-fermentation
  • Continuous and discontinuous
  • Determining the following parameters depending on the operating conditions
  • Biogas yield
  • Biogas flow rate
  • Biogas quality

Specification

  • Two-stage biogas plant (continuous or discontinuous operation possible)
  • 2 stirred tank reactors made of stainless steel with capacitive level sensors
  • Separate supply unit with substrate tank and feed pump
  • Control of temperature and pH value in the reactors
  • 2 metering pumps for acid and caustic
  • Heating water circuit with tank, heater, temperature controller and pump
  • Biogas is dried with silica gel
  • Biogas analysis: flow rate, methane content, carbon dioxide content, humidity and temperature
  • Control of the experimental plant using a PLC, operated by touch screen

Technical Data

  • Tanks made of stainless steel
  • reactor (stage 1): approx. 20L
  • reactor (stage 2): approx. 70L
  • substrate tank: approx. 25L
  • digestate tank: approx. 25L

Pumps

  • 3 peristaltic pumps: each max. 25L/h
  • 2 metering pumps: each max. 2,1L/h
  • heating water pump: max. 480L/h
  • Stirring machines
  • substrate tank: max. 200min-1
  • reactors: each max. 120min-1

Measuring Ranges

  • methane content: 0…100%,
  • carbon dioxide content: 0…100%
  • flow rate: 0…30NL/h (biogas)
  • pH value: 2x 1…14
  • humidity: 0…100%
  • temperature: 3x 0…100°C (reactors and biogas)
  • 400V, 50Hz, 3 phases
  • 400V, 60Hz, 3 phases; 230V, 60Hz, 3 phases

 

Tell us Your Requirements

Sending your message...



Your Cart

Your Cart is Empty! Go Shopping