If you are a college or university looking to setup a complete lab. Please contact us with your details for custom quotation. [email protected]

Assembly & Maintenance Exercise Refrigeration

We are the leading manufacturer and supplier of Assembly & Maintenance Exercise Refrigeration. Now accepting bulk orders for government tenders in every major country around the globe.

Using Trainees Can Learn Working Within A Complex Project. This Involves The Planning, Implementation And Checking Of Processes Related To Assembly, Commissioning And Maintenance. The Assembly Relates To Refrigeration Installation: Installation Of The LP And HP Pressure Switches, The Expansion Valve And The Pipework Of The Refrigeration Circuit. The Pipe Joints Are Not Soldered But Bolted. The Electrotechnical Installation Includes The Wiring And Connection Of All Units And Switching Elements. For Assembly The Tool Setfor Commissioning The System The Filling And Evacuation Equipment Are Required. The Fully Assembled System Represents A Fully Functional, Temperature-Controlled Refrigeration System With Refrigeration Chamber And Electrical Thermostat. Repeated Assembly And Disassembly Are Possible.

Learning Objectives And Experiments

  • Reading And Understanding Technical Documentation
  • In Conjunction With
  • Planning And Executing Assembly Steps And Processes
  • Making Pipe Joints In Accordance With A System Diagram
  • Carrying Out Electrical Installation In Accordance With A Circuit Diagram
  • In Conjunction With
  • Filling And Evacuating Of The Refrigeration System
  • Commissioning And Checking The Refrigeration System After Successful Assembly
  • Familiarisation With The Function Of A Refrigeration System As A System And Its Components As System Components
  • Fault Analysis: Fault Finding, Fault Evaluation And Repair
  • Planning, Executing And Evaluating Maintenance Processes

Specification

  • Assembly Project For The Training Of Mechatronics Engineers For Refrigeration
  • Assembly Of A Refrigeration System With Refrigeration Chamber From A Complete Kit
  • Refrigeration System Designed For Operation With Refrigerant R513A
  • Temperature Control Via Thermostat
  • Air-Cooled Condensing Unit With Compressor
  • Refrigeration Chamber With Integrated Show Case Evaporator And Fan
  • Refrigeration Chamber With Large Sight Window
  • Assembly Panel To Mount The Refrigeration And Electrical Components
  • Electrical Assembly In Accordance With The Circuit Diagram
  • Easy Pipeworking Of The Refrigeration Circuit Using Bolted Pipe Joints
  • Workbench With Drawers To Store The Components

Part Of The Practice Line For Assembly, Maintenance And Repair

Technical Specification

  • Condensing Unit
  • Power Consumption: 190W
  • Receiver: Approx. 1L
  • Show Case Evaporator
  • Capacity: 50W At T0=-6°C, ΔT=8K
  • Transfer Area: 1,06m2
  • Refrigeration Chamber With Sight Window
  • Lxwxh: 480x280x390mm
  • Aluminium Assembly Panel
  • Lxw: 710x500mm
  • Thermostatic Expansion Valve, Adjustable
  • Thermostat, Adjustable: -30…15°C
  • 230V, 50Hz, 1 Phase
  • 120V, 60Hz, 1 Phase; 230V, 60Hz, 1 Phase

 

Tell us Your Requirements

Sending your message...



Your Cart

Your Cart is Empty! Go Shopping